What a reconciliation report looks like
A layout sample. Buyer, supplier and lot are redacted, and the values shown are placeholders, not a client case.
Scope line on every report. As-is reconciliation, not quality confirmation.
How each row is marked
- Matched
- The documents agree with each other and with your PO and specification on this point.
- Discrepancy
- Two documents disagree, or a document disagrees with your PO. Both values are quoted with their source.
- Evidence missing
- A document or field you require was not supplied or not reported. We list what to ask for.
- Out of scope
- A point that needs a surveyor, a laboratory or a lawyer. We say so and do not conclude.
What the report is built from
- Your PO, contract and specification fields.
- The supplier’s offer, PI, packing list and loading documents.
- The report and photographs of the surveyor you appoint.
- Laboratory certificates the supplier or you provide.
- Public registers and notices, each with the date read.
What it does not do
- It does not confirm quality, safety or origin.
- It does not replace the surveyor’s or laboratory’s own signed report.
- It is not an inspection, a certificate or a customs, tax or legal conclusion.
Want this for your next lot?
GL-01 starts from your PO. GL-03 reconciles the loading report.